Rational ProjectConsole Designer Help
You can manage the scheduled task logs from the Scheduled Task Logs window, where you can view information for all the task logs at a glance.
To open the Scheduled Task Logs window, in the Designer navigation tree, click Scheduled Task Logs.
You can perform the following tasks in the Scheduled Task Logs table:
To sort tasks by name, host, status, number of rows inserted rows inserted, or start time, click the corresponding column heading.
To delete the measures collected in a task run, click the row for the task run log, right-click the row, and then click Delete collection measures.
To delete a task log, click the row that contains the task log name, right-click the row, and then click Delete task log(s).
To stop a collection task in progress, click the row that contains the task log name, right-click the row, and then click Stop collection.
To open the Task Log window and view the properties, parameters, and output for a task log, double-click the row that contains the task log name, or right-click the row that contains the task log name, right-click the row, and then click Properties.
For more information about managing the task logs, see Scheduled Task Logs window.