3.6.1-TMF-0051 Verification Summary Report ------------------------------------------ This report summarizes the results of 3.6.1-TMF-0051 verification. External ID 3.6.1-TMF-0051 Internal ID 361TMF51 Fixes contained in patch ------------------------ IY04723: The wrpt command incorrectly displays the error msgs IX78924: wcrtpfrmgr to create a profile manager, it leaves a locked transaction 67302: validating a profile for a profile manager, a new process, called "profile_script", is created IX85547: populating a group profile from an NIS domain, the NIS domain is not available IX83134: profile manager is changed from a datafull endpointmanager to a 77787 dataless endpoint manager the icon is not updated IX86645: extra icon appears when using drag and drop to move a subscriber from a dataless IX81017: Moving a profile from one profile manager to another does not unsubscribe the profile IX85884: HP/UX TMR server with approx 11,000 PC managed nodes appears to hang. IX71234: "Message Decrypt Failed - Number Mismatch" IX84170: Transaction locks are not being released IX83919: NT system installed as a managed nodethe managed node will not connect to the TMR. IX84264: wchkdb -ux does not complete when it is executed. IX75347: "Distribute entries and ANY changes" and the source files do not exist, an ambiguous error message is generated IY02869: SWD log file has relatively open file permissions IY01517: SWD does not generate a notice or send an e-mail when a filepack block is distributed Verification Results -------------------- Defect/APAR Test Status ----------- ---- ------ IX81017: Created 2 profile managers and used drag and drop PASS 67302: Ran 3 tasks and insured they had different pids PASS IX75347: Verified that you get a meaningful error msg PASS IX83134: Verified that the icon changes between dataless and not PASS IX85547: Verified that nismaps are available on all UNIX tier1 PASS IX86645: Verified that the endpoint moves with the profile PASS IY02869: Verified that the log file has 600 for permissions PASS IY01517: Verified that e-mail and notices were sent PASS IX84170: Verify that transaction locks are released [1] IX84264: Verify that wchdb -ux does not impact production [1] environment 69018: Verified that no Exception seen in wchkdb or wclient PASS 79441: Verified that Profile Manager can be openned after EP PASS subscription IX85884: Verified performance with 1000's of PCMN on HP server PASS IY04723: Verified that wrpt works in interconnected TMR's PASS IX69100: Verified that Email status works for distribution of PASS Autopack IX78924: Verified locked transactions aren't left by wcrtpfrmgr. PASS IX71234: Verified migration of Endpoint from a DES-encrypted TMR PASS to a MN worked. IX83919: Verified NT MN could connect to TMR after it rebooted. PASS Regression Tests ---------------- - ran the full framework regressions on all tier1 Interps PASS - ran the Multiplexed Distribution regressions on all tier1 Interps PASS - Installation via SIS, wpatch, and the Tivoli Desktop. PASS Build Iteration ---------------- 2 Architecture Configuration(s) verified -------------------------------------- aix4-r1, hpux10, solaris2, sunos4, w32-ix86 Tivoli Software Configuration used in verification -------------------------------------------------- Framework 3.6.1 Framework Patch 3.6.1-TMF-0051 Software Installation Service 3.6 Schedule Milestones ------------------- Patch received date 09/28/99 Verification begun date 10/04/99 Verification complete date 11/10/99 Patch Review start date 11/10/99 Patch Review complete date 11/10/99 Date notified/released to L3 11/10/99 Number of README modification cycles 2 Patch Distribution Mechanism ---------------------------- Tivoli's FTP server Verification Performed by ------------------------- wrw Special Notes/Comments ---------------------- [1] Unable to reproduce in lab environment but beta versions of the fixes were run at customer site. Also, 3.6.1-COU-0014 is required for some of the defects to be fixed.